What each Incoterms® 2020 rule means for a steel deal: who books the freight, who insures, who clears customs and where the risk moves from seller to buyer. Plus the bill of lading terms and container sizes you will meet.
Incoterms® rules split the tasks, costs and risks of delivering goods between seller and buyer. They say who books and pays the main transport, who insures, who clears customs at each end and at which point the risk of loss or damage moves to the buyer. They do not decide when ownership passes, how or when the buyer pays, or what happens if the contract is broken — the sale contract has to do that.
Always write the rule with a precise named place and the edition, for example CFR Jebel Ali, UAE — Incoterms® 2020.
| Rule | Main carriage paid by | Insurance | Export clearance | Import clearance & duties | Risk passes to the buyer |
|---|---|---|---|---|---|
| Any mode of transport, including multimodal and containers | |||||
| EXW Ex Works |
Buyer | No obligation | Buyer | Buyer | When the goods are put at the buyer's disposal at the seller's works, not loaded. |
| FCA Free Carrier |
Buyer | No obligation | Seller | Buyer | When the seller hands the goods to the buyer's carrier at the named place (loaded, if that place is the seller's own premises). |
| CPT Carriage Paid To |
Seller | No obligation | Seller | Buyer | When the seller hands the goods to the first carrier — even though the seller pays carriage to the destination. |
| CIP Carriage and Insurance Paid To |
Seller | Seller — broad cover (Institute Cargo Clauses A) | Seller | Buyer | As CPT: on handing to the first carrier. |
| DAP Delivered at Place |
Seller | No obligation | Seller | Buyer | At the named destination, on the arriving vehicle, ready for unloading. |
| DPU Delivered at Place Unloaded |
Seller | No obligation | Seller | Buyer | At the named destination, once unloaded — the only rule where the seller unloads. |
| DDP Delivered Duty Paid |
Seller | No obligation | Seller | Seller | At the named destination, ready for unloading, cleared for import with duties paid. |
| Sea and inland waterway only | |||||
| FAS Free Alongside Ship |
Buyer | No obligation | Seller | Buyer | When the goods are placed alongside the buyer's vessel at the port of shipment. |
| FOB Free On Board |
Buyer | No obligation | Seller | Buyer | When the goods are on board the vessel at the port of shipment. |
| CFR Cost and Freight |
Seller | No obligation | Seller | Buyer | When the goods are on board at the port of shipment — although the seller pays the freight to the destination port. |
| CIF Cost, Insurance and Freight |
Seller | Seller — minimum cover (Institute Cargo Clauses C) | Seller | Buyer | As CFR: on board at the port of shipment. |
Under the C rules the seller pays the main carriage, but the risk has already passed at origin: a cargo damaged at sea under CFR is the buyer's loss, and the buyer's claim is against the carrier or insurer. Under CIF and CIP the seller must insure in the buyer's favour for at least 110% of the contract value.
Green is the stretch at the seller's risk, orange at the buyer's; the dark line is the point where risk passes.
Incoterms® and the Incoterms® 2020 logo are trademarks of the International Chamber of Commerce. The rules are published by the ICC — iccwbo.org — Incoterms® 2020. This page is a plain-language summary, not the rules.
The bill of lading is the carrier's receipt for the cargo, evidence of the contract of carriage and — when issued "to order" — the document of title that the buyer needs to collect the goods.
| Container | External L × W × H, mm | Typical internal L × W × H, m | Typical capacity, m³ | Typical tare, kg |
|---|---|---|---|---|
| 20 ft dry (20' GP) | 6,058 × 2,438 × 2,591 | 5.90 × 2.35 × 2.39 | 33 | 2,200–2,300 |
| 40 ft dry (40' GP) | 12,192 × 2,438 × 2,591 | 12.03 × 2.35 × 2.39 | 67 | 3,700–3,800 |
| 40 ft high cube (40' HC) | 12,192 × 2,438 × 2,896 | 12.03 × 2.35 × 2.69 | 76 | 3,800–4,000 |
External sizes are the ISO 668 dimensions; ISO 668 rates these containers at up to 30,480 kg gross. Internal sizes, tare and the maximum payload vary by builder and carrier — read them off the container's plate or ask the line. Steel fills a container's weight limit long before its volume, and road weight limits at either end are often lower than the container's own rating.
A summary for orientation, not legal advice. The sale contract and the official ICC text govern.
Translation isn’t available right now. The site is shown in English.